Contents
- 1 Management
- 1.1 Management Principles
- 1.2 Process Safety Information and Knowledge
- 1.3 Project Management
- 1.4 Risk Management
- 1.5 Management of Change
- 1.6 Mechanical Integrity
- 1.7 Human Factors
- 1.8 Training and Performance
- 1.9 Incident Investigation
- 1.10 Emergency Planning and Response
- 1.11 Auditing
- 1.12 Operational Integrity
- 2 Technical Tools
- 3 Science
Management
Management Principles
Level 2 | Level 3 | Level 4 | Keywords |
Management Principles | Principles | ||
Leadership | Leadership | ||
Commitment | Commitment | ||
Continuous Improvement | Continuous Improvement | ||
Integration with Operations | Integration with Operations | ||
Benchmarking and Metrics | Metrics | ||
Leading Indicator | |||
Lagging Indicator | |||
Personal Safety metrics | |||
Process Safety performance metrics | |||
Near-miss reporting | |||
Safety Culture | Safety Culture | ||
Safety Climate | |||
Safety Attitude |
Process Safety Information and Knowledge
Level 2 | Level 3 | Level 4 | Level 7 | Level 8 | Keywords |
Process Safety Information and Knowledge | Process Safety Information | ||||
Hazards Management | Hazards | ||||
Toxicity Information | |||||
Permissible Exposure Limits | |||||
Physical Data | |||||
Reactivity Data | |||||
Corrosivity Data | |||||
Thermal and Chemical Stability Data | |||||
Mixing Effects | |||||
Flammability Diagram | |||||
Explosion Indices | |||||
Process Design | Process Design | ||||
Process Flow Diagram | Pre-FEED | PFD | |||
Piping and Instrumentation Diagram (P&ID) | FEED | P&ID | |||
Barriers | |||||
Operational Data | Operations | ||||
Upper and Lower Safe Limits | |||||
Upper and Lower Operating Limits | |||||
Critical Alarms | |||||
Maximum Intended Inventories | |||||
Resilience | Early warning signalling | ||||
Instrumentation | Safety dashboard | Instrumentation | |||
Relief System Design and Design Basis | Relief | ||||
Interlocks & Safety | Safety | ||||
SIL levels | |||||
Safety Instrumented Systems (SIS) | SIS | ||||
Facility | Facility | ||||
Ventilation System Design | |||||
Plot Plan | |||||
Facility Siting Data | |||||
Electrical Classification | |||||
Recommendation Tracking |
Project Management
Level 2 | Level 3 | Level 4 | Level 7 | Keywords |
Project Management | Project Management | |||
Inherently Safer Design (ISD) | Resilience enhancement | ISD | ||
Review Procedures | Safety Review | |||
Commissioning | ||||
Pre-startup Review |
Risk Management
Level 2 | Level 3 | Level 4 | Keywords |
Risk Management | Risk | ||
Hazard Identification | |||
Risk Assessment | Risk Assessment | ||
Risk Management | Risk Management | ||
Risk-based Process Safety Management | |||
Risk Resolution | |||
Process Hazard Analysis | PHA | ||
Conduct of PHAs | Conduct | ||
Reduction of Risk | |||
Residual Risk Management | |||
Process Management during Emergencies | |||
Encouraging Client and Supplier Companies to Adopt Similar Risk Management Practices |
Management of Change
Level 2 | Level 3 | Level 4 | Keywords |
Management of change | MOC | ||
Change of Process Technology | Process | ||
Change of Facility | Facility | ||
Organizational Changes That May Have an Impact on Process Safety | Organizational |
Mechanical Integrity
Level 2 | Level 3 | Level 4 | Keywords |
Mechanical Integrity | Mechanical Integrity | ||
Reliability Engineering | Reliability | ||
Materials of Construction | Materials | ||
Fabrication and Inspection Procedures | Fabrication | ||
Maintenance Procedures | Maintenance | ||
Inspections | Inspection | ||
Preventive Maintenance | |||
Process, Hardware, and Systems Inspections and Testing | |||
Installation Procedures | |||
Alarm and Instrument Management | |||
Quality Assurance | |||
Demolition Procedures |
Human Factors
Level 2 | Level 3 | Level 4 | Keywords |
Human Factors | Human Factors | ||
Administrative Controls versus Hardware Engineering Controls | Administrative Controls | ||
Human Error Assessment | Human Error | ||
Human Error | |||
Operational Error | |||
Design Error | |||
Document Error | |||
Maintenance/repair Error | |||
Procedure Error | |||
Shift Change Error | |||
Tool Unsatisfactorily | |||
Man-Machine Interface | Interfaces | ||
Ergonomics | |||
Control room lay-out | |||
Lighting | |||
Communications |
Training and Performance
Level 2 | Level 3 | Level 4 | Keywords |
Training | Training and Performance | ||
Skill Inventory | |||
Selection and Development of Training Program | Programs | ||
Refresher Training | Refresher | ||
Initial Training | Initial | ||
Records Management | Records |
Incident Investigation
Level 2 | Level 3 | Level 4 | Keywords |
Incident Investigation | Incident investigation | ||
Incident Recording, Reporting and Analysis | Investigation | ||
Incident Classification | |||
Metrics | Metrics | ||
Leading Indicator | |||
Lagging Indicator | |||
Personal Safety Metrics | |||
Process Safety Performance Metrics | |||
Near-miss Reporting | |||
Company Memory – Lessons Learned | Lessons Learned | ||
Data Collection and Sorting |
Emergency Planning and Response
Level 2 | Level 3 | Level 4 | Keywords |
Emergency Planning and response | Emergency | ||
Emergency Planning | |||
Emergency Response | |||
Emergency Response | |||
Preparedness | |||
Response | |||
Recovery | |||
Drills |
Auditing
Level 2 | Level 3 | Keywords |
Auditing | Audits | |
Findings | Findings | |
Observations | Observations | |
Recommendations | Recommendations |
Operational Integrity
Technical Tools
Hazards Identification
Level 1 | Level 2 | Level 3 | Keywords |
Hazards Identification | |||
Non-Scenario-Based Hazard Evaluation Procedures | |||
Preliminary Hazard Analysis (PreHA) | PreHA | ||
Safety Review | Review | ||
Relative Ranking | Index, Ranking | ||
Checklist Analysis | Checklists | ||
Scenario-Based Hazard Evaluation Procedures | |||
What-If Analysis | WI | ||
What-If Analysis/Checklist Analysis | WI | ||
Hazard and Operability (HAZOP) Studies | HAZOP | ||
Failure Mode and Effects Analysis (FMEA) | FMEA | ||
Hazard Identification Studies | HAZID |
Risk Assessment
Facilities
Level 1 | Level 2 | Level 3 | Keywords |
Facilities | |||
Plant Layout | Layout, Siting | ||
Site and Plant Layout | Placement, Safety Distance, Risk, Construction | ||
Equipment Layout and Spacing | Equipment, Safe Distance | ||
Temporary Buildings | Building | ||
Permanent Buildings | Building | ||
Layout Optimization | Optimization, Optimum Distance | ||
Shared Sites | |||
Personnel Protection | |||
Location of Fire Protection | Protection, Firefighter, Fire | ||
Control Room Protection | Control, Personnel | ||
Personal Protective Equipment | |||
Safe Refuge Location |
Mechanical Integrity
Level 1 | Level 2 | Level 3 | Keywords |
Mechanical Integrity | |||
Risk Management Tools | |||
Risk-based Inspection (RBI) | RBI | ||
Failure Modes and Effects Analysis (FMEA) and Failure Modes, Effects and Criticality Analysis (FMECA) | FMEA, FMECA | ||
Reliability-centered Maintenance (RCM) | RCM | ||
Layer of Protection Analysis (LOPA) | LOPA |
Human Factors and Errors
Level 1 | Level 2 | Level 3 | Level 4 | Keywords |
Human Factors and Errors | ||||
Human Reliability Analysis | Reliability, Factors | |||
Task Related | ||||
Technique for Human Error Rate Prediction | Technique for Human Error Rate Prediction | |||
Cause-based Decision Tree | Cause-based Decision Tree | |||
Human Error Assessment and Reduction Technique | Human Error Assessment and Reduction Technique | |||
Time Related | ||||
Time Reliability Curve | Time Reliability Curve | |||
Operator Reliability Experiments | Operator Reliability Experiments | |||
Operator Reliability Experiments/Human Cognitive Reliability | Operator Reliability Experiments/Human Cognitive Reliability | |||
Context Related | ||||
Cognitive Reliability and Error Analysis Method | Cognitive Reliability and Error Analysis Method | |||
Hollistic Decision Tree | Hollistic Decision Tree | |||
A Technique for Human Error Analysis | A Technique for Human Error Analysis | |||
Cognitive Reliability and Error Analysis Method II | Cognitive Reliability and Error Analysis Method II | |||
Methode d’Evaluation de la Realisation des Missions Operateur pour la Surete | Methode d’Evaluation de la Realisation des Missions Operateur pour la Surete | |||
Standardized Plant Analysis Risk-Human Reliability | Standardized Plant Analysis Risk-Human Reliability | |||
Success Likelihood Index Method | Success Likelihood Index Method |
Science
Larger Scale Chemical
Level 1 | Level 2 | Level 3 | Level 4 | Keywords |
Larger Scale Chemical | ||||
Liquefied Natural Gas | LNG | |||
Vapor Cloud Dispersion | ||||
Fire Control by Water Curtain Spray | ||||
Plume Visualization in Atmosphere | ||||
Burning Rate and Heat Transfer to Pool Fire | ||||
Other | ||||
Ammonia | Ammonia | |||
Production Process Science | ||||
Storage Safety | ||||
Other | ||||
Liquefied Petroleum Gas | LPG | |||
Transport Pipeline Setting | ||||
Storage Safety | ||||
Other | ||||
Chlorine | Chlorine | |||
Production Process Science | ||||
Storage Safety | ||||
Other | ||||
Others | ||||
Ammonium Nitrate/Fertilizer |
Emission Analysis
Level 1 | Level 2 | Level 3 | Keywords |
Emission Analysis | |||
Two-Phase Flow | Two-Phase Flow | ||
Fauske Models | |||
Leung Models | |||
Single Phase Flow Regime | |||
Double Phase Flow Regime | |||
Gassy, Tempered, Hybrid Division | |||
Device Control Phenomena | Device Control | ||
Depressurization | |||
Blowdown | |||
Rupture | |||
Vaporization | |||
Other Applicable Models | |||
Others |
Dispersion Analysis
Level 1 | Level 2 | Level 3 | Keywords |
Dispersion Analysis | |||
Parameters Affecting Dispersion | Dispersion Influential Factors | ||
Wind Speed | |||
Atmospheric Stability | |||
Ground Conditions | |||
Height of Release above Ground Level | |||
Momentum and Buoyancy of Initial Material | |||
Other Dispersion Parameters | |||
Dispersion Models | Dispersion Models | ||
Neutrally Buoyant Dispersion Models | |||
Dense Gas Dispersion Models | |||
Other Applicable Models | |||
Others |
Chemical Reactivity
Level 1 | Level 2 | Level 3 | Level 4 | Level 5 | Keywords |
Chemical Reactivity | |||||
Reactive Materials | Reactive Materials | ||||
Thermodynamic Properties | |||||
Reaction Energy | |||||
Adiabatic Temperature Rise | |||||
Gas Generation | |||||
Maximum Pressure after Reaction | |||||
Latent Heat | |||||
Vaporization | |||||
Melting | |||||
Other Properties | |||||
Kinetic Properties | |||||
Reaction Rate | |||||
Nth order | |||||
Autocatalytic | |||||
Mechanistic | |||||
Rate of Heat Generation | |||||
Rate of Pressure Rise | |||||
Apparent Activation Energies | |||||
Decomposition Temperature | |||||
TMR | |||||
TNR | |||||
SADT | |||||
ADT 24 | |||||
Other Properties | |||||
Reactive Interactions | Reactive Interactions | ||||
Instability | |||||
Polymerization | |||||
Pyrophoricity | |||||
Peroxide Formation | |||||
Water Reactivity | |||||
Oxidation | |||||
Other Interactions | |||||
Runaway Reaction Consequence | |||||
Gas Evolution | |||||
Temperature | |||||
Pressure | |||||
Other Consequence | |||||
Others |
Flammability
Toxicity
Level 1 | Level 2 | Level 3 | Level 4 | Keywords |
Toxicity | ||||
Health Hazards | Health Hazards | |||
Acute Toxicity | ||||
Skin Corrosion/Irritation | ||||
Serious Eye Damage/ Eye Irritation | ||||
Respiratory or Skin Sensitization | ||||
Aspiration Toxicity | ||||
Target Organ Systemic Toxicity – Single Exposure | ||||
Asphyxiation | ||||
Chronic Toxicity | ||||
Germ Cell Mutagenicity | ||||
Carcinogenicity | ||||
Reproductive Toxicology | ||||
Target Organ Systemic Toxicity – Repeated Exposure | ||||
Environmental Hazards | Environmental Hazards | |||
Aquatic Toxicity | ||||
Atmospheric Toxicity | ||||
Dose and Response Models | Dose and Response Models | |||
Lethal Dose | ||||
Effective Dose | ||||
Probit Correlations | ||||
Threshold Limit Values | ||||
Others |
Other Field of Study
Level 1 | Level 2 | Level 3 | Keywords |
Other Field of Study | |||
System Safety | |||
System-Theoretic Process Analysis | |||
HazOp Automation | |||
Blended Hazid | |||
Smart P&ID | |||
Multi-Flow Modeling | |||
Abnormal Situation Diagnosis | |||
Failure Data/Reliability Engineering |